Wednesday, 28 October 2015

"Minafon" week 16, Thursday

Miserable wet day here today so just as well most of the outside work is done. Dave the electrician, Tom the plumber (son of Wayne) and Matt and Mark the air-con guys were all working away there today and Matt had decided to brave the rain and install the external split system units anyway. Internal air-con units are all in, most mixers and taps and the lights etc just about done. The stainless wiring on the deck/porch has been installed this morning. After today, all that remains to be done are the timber floor polishing, carpets, screening and shower screens - that's it!!!!

deck now complete!!!
Dave installing pendant lights over island bench

Our ensuite also just about completed - just bath mixer to go

view from "down the road a bit" - 

"Minafon" - week 16, Wednesday


completed laundry (except for mixer)

ensuite floor and walls grouted
No new pics today - thought that pictures of door latches and towel rails might be just a bit boring! Mark (tiler) finished today with siliconing all the wet  areas - the whole tiling job looks terrific. Scott and Steve were there doing all the door knobs and latches, towel rails, toilet-roll holders etc etc so we just had to go over and chat about the positions of all those bits. Also installed the glass in the ensuite/bedroom niche spaces. They are kindly going to install our clothes line and the baskets in the wardrobe for us.

There might be some chance of an "early" moving day as they are going to spend the weekend after next cleaning - and so when the carpets go in with the insect-screening on Monday 9th it may be ready for us to move in!

The internal air-con units go in tomorrow and the external units on Friday. Electrical is all to be connected ready to go "live" on Friday as well and Chris also comes along then to do the finishing off and fixing any scratches etc from the electrical/aircon and plumbing fit-outs. These guys are fantastic at co-ordinating everything - Chris the painter was even there last Sunday doing the last coat on the deck!!

The weather here has been quite wet (40mm in a storm last night and steady rain all day today) - so the driveway/grasspaver installation might be waiting until next week - we'll see.

Tuesday, 27 October 2015

"Minafon" - week 16, Tuesday

A relatively quiet day today - Mark finished off the grouting and now just has the sealing to complete tomorrow and he is "done". When we went over to drop off the clothes line this morning, the guys were there installing the fireplace and flue - that's all done now and we just have to light it up with three "small" fires to cure the paint etc apparently - in this weather?????

I've started on the letter box posts so that will be ready to install as soon as the drive-way is done - this week sometime apparently. Getting just a bit impatient to get in and enjoy all the things we've been seeing being put in place!

now we just need the bath back!

fire place ready - probably not for a while yet though!

Range-hood now complete

...even the kitchen sink

no smoke for a while yet.

Monday, 26 October 2015

"Minafon" - week 16, Monday

OK - the "big" stuff is all done, now we are into the finishing off fitting bits and pieces - still numerous "tradies" around all day though. Got a "call" from Mandy at lunch-time to go over and see Dave re light positions in our bedroom and Wayne re positions for the "insinkerator" and water filter and Trevor re the position of the gas tanks - all that going on today!  Glad we're retired and flexible!

A few update shots:

back view - only the stainless wires to go on rails and it's done

can't wait to get onto our deck!

hot water (solar) and gas now fitted

 bathroom only waiting for tap and mirror 

cook-top installed and range-hood almost ready

Friday, 23 October 2015

"Minafon" - week 15, Saturday

It might be Saturday, but that doesn't stop work at 65 La Frantz drive! Having the usual Saturday morning coffee with the cycle group and got a call from Mark the tiler - Could we pop over to check on a couple of things with the hearth tiles please?? So after coffee we went over and found not only Mark ready to see us but Chris was also there putting coat#2 on the deck, porch and railings. We sorted out the layout of the hearth tiles with Mark and before we left he had them in! He now just has to do grouting next week and he'll be finished (probably Tuesday).
Also had to go over again at 2.00 to meet Peter Polly and decided to use a "wax" finish rather than water-based - shows the colours beautifully.
louvres in, hearth tiles in, deck 2nd coat

"feature" tiles - bath hob

"feature" tiles again - shower

laundry tiling now complete (minus grouting)

Thursday, 22 October 2015

"Minafon" - week 15, Friday

No pics today - we went over this morning to shift the grass pavers into the garage and Mark the tiler was working - he's put the feature tiles in and they look terrific - really finish it off. I'll take some pics and put them on the blog tomorrow as we have to go over and meet Peter Polly at 2.00pm to look at the different flooring finishes and choose which one we want.

Timetable for the next three weeks:

  • next week, electrical fit-out, plumbing fit-out all completed and completion of tiling.
  • last coats put on decking and railings
  • Air-con all goes in Friday
  • following week (2nd November+) - Peter Polly on his own to do floors - needs until Friday to complete and no-one else allowed in!
  • 9th November, carpets laid in bedrooms
  • 10-12th cleaning and fly-screening done
  • 13th - move in!

"Minafon" - week15, Thursday

Three weeks tomorrow and we should be moving!! Ouch

Electrician and tiler hard at work today. More powerpoints, lights, fans are installed and the tiling is nearing completion in the ensuite and bathroom - just the toilet and the laundry to go. Lots of plumbing supplies such as toilets, mixers etc stored in the garage today so he must be about to get into those. Just a couple of photos today -
ensuite with "niche" windows to bedroom -tile gaps to have "feature tiles"

TV/library now has fan and downlights